Friday, January 20, 2012

Ductwork and Insulation

We fixed the cold air intake and insulated the attic in Autumn. The cold air intake was all disconnected and was pouring in the warm air from inside the building up into the attic. We also started to insulate the roof. This should fix the ice build-up.

No comments:

Post a Comment